Prologis Ports Elizabeth Triport - RC Andersen
1438
projects-template-default,single,single-projects,postid-1438,mkd-core-1.0.2,rca-template,ajax_fade,page_not_loaded,,rca child-child-ver-1.0.0,onyx-ver-1.4.1, vertical_menu_with_scroll,smooth_scroll,grid_1300,wpb-js-composer js-comp-ver-7.9,vc_responsive

project

Prologis Ports Elizabeth Triport

Landfill redevelopment including different ground improvement techniques: Surcharging, Deep Dynamic Compaction, CMCs. This was a three-phase project consisting of demolitions, geotechnical solutions, and ground up building construction with 101,000sf fit out. A key element of this project was the construction of a 2,000-foot-long rail line servicing the building. The distribution center features Automated Robotic AR Placement with ASRS material handling/automated racking. VMS (Vapor Mitigation Systems) were installed inside and outside the building, throughout the site.

Project Size

540,000 SF

Industrial

Demolition
Environmental
Geotechnical
HAZMAT
Multi-Phase
Port Location
LEED Certified
Substation
EV Charging
WH/Distribution

Location

Elizabeth, NJ