Lincoln Gateway - RC Andersen
1518
projects-template-default,single,single-projects,postid-1518,mkd-core-1.0.2,rca-template,ajax_fade,page_not_loaded,,rca child-child-ver-1.0.0,onyx-ver-1.4.1, vertical_menu_with_scroll,smooth_scroll,grid_1300,wpb-js-composer js-comp-ver-7.9,vc_responsive

project

Lincoln Gateway

Demolition of four main structures, existing utilities and site conditions, and build-to-suit, ground up construction of the last-mile distribution center. Located just outside Manhattan, the 325,000sf distribution facility is in the heart of the Meadowlands of New Jersey. Rigid inclusions totaling 5,094 CMCs with an average depth of 150’, hit a max record of 171’7” depth.

Project Size

325,000 SF

Industrial

Demolition
Geotechnical
WH/Distribution

Location

Secaucus, NJ